Tytherton Road

Location: Tufnell Park, London

, UK

2021

Refurbishment of a two-story Victorian terraced house in North London, planned and delivered in two phases. A phased approach to this project enabled the young family to move into and get to know the building. Our initial involvement focused on reconfiguring the stairs and roof space to provide them with an additional bedroom and bathroom. Greater efficiency of stair layout and circulation, together with enlargement of the existing roof dormer, gave them more space and light. 

Read More

As the family has grown, so its needs have changed – from open plan living to the desire for a sequence of separate spaces, to most recently, an ambition to extend the house and create rooms for different purposes – home working, study and entertaining - which link together. 

This project highlights the benefits of living with and getting to know buildings, as well as that of long term client relationships. Together we have enjoyed design discussions over a number of years, testing options as they have come to know the house.

Process

Concept design

Construction

Drawings

160.

Tytherton Road

Year:

2021

Team: Oliver Cooke, Eden Day, Millie Johnson